PROJECT

Perth Children’s Hospital

Mobile & Static Clinical Shelving, Wire Racks and Stainless Steel Trolleys at Perth Children’s Hospital

This $1.2 billion projects new state-of-the-art children’s hospital has a 208 bed capacity, 12 operating theatres, an integrated research and educational facility and WA’s only paediatric trauma centre and research facility.

IntraSpace assisted John Holland with the design and specification of all shelving and storage solutions on this project.  This covered approx. 520 rooms and included 170 FileStor mobile and static shelving systems, 14 Flammable and corrosive cabinets, 350 IntraMed modular racks, 230 IntraMed wire shelving bays, 30 Library shelving bays and 310 IntraMed stainless steel trolleys.

For the full Case Study, click here.

Related projects

See our library, medical & healthcare storage system fitouts. Whatever the project you are involved in, you need a team with experience that can help you get it right the first time – because space is valuable! 

1Z2A5323
Read More
Intraspace - Westmead Children_s Hospital-14
Read More
intraspace_sydney_childrens-0632
Read More
ENQUIRE

Want to see the same results?

Share your site plan (or existing layout) and we’ll highlight opportunities, constraints, and the fastest path to a compliant, high-performing outcome.